
The crew of Station Shelby will take a survey of the Wolf River Greenway:
Greenway East, part of the Wolf River Greenway. 3.6 miles, paved. We will start at 6730 Humphreys Blvd and end at 6324 Humphreys Boulevard. I will aim to arrange my car at the end to shuttle us back to beginning. Rain date will be Saturday 10/18.